Which construction materials most often generate losses - and how can they be prevented?

2 min read TipsInventoryFinance

Losses on construction sites are hidden costs

According to a report by the Federation of Construction Entrepreneurs, 10–15% of building materials end up wasted due to errors, theft, or poor management. Here are 6 of the most problematic material types and proven ways to reduce losses - including how Contractors.es can help.

1. Cement and mortars

Problem:

  • Drying out (open bags, improper storage)
  • Incorrect dosing (excess mixture that loses its properties)
  • Theft (easy-to-sell material)

How to prevent it:✔ Store in dry, closed spaces - use airtight containers.✔ Mix only the amount needed.✔ Monitor deliveries.

2. Wood and boards (OSB, drywall)

Problem:

  • Mechanical damage (improper transport or storage)
  • Warping (moisture, no supports)
  • Theft (popular material on the “black market”)

How to prevent it:✔ Store on supports - at least 20 cm above the ground, under cover.✔ Label and inventory - scan barcodes when issuing materials (feature available in Contractors.es).✔ Order just-in-time - avoid excess stock on-site.

3. Insulation materials (styrofoam, mineral wool)

Problem:

  • Damage during cutting/installation (execution errors)
  • Improper storage (compression, moisture)
  • Cutting waste (poor planning)

How to prevent it:✔ Train teams on precise cutting and installation to minimize waste.✔ Use accurate cutting tools (e.g., hot wire cutter for styrofoam).✔ Plan exact quantities in advance.

4. Ceramics (tiles, clinker)

Problem:

  • Cracking during transport or storage
  • Order errors (too much or too little)
  • Theft (high-value material)

How to prevent it:✔ Inspect deliveries on-site - report damage immediately (photograph and document in the system).✔ Order with a 5% reserve (no more!) - Contractors.es helps track consumption in real time.✔ Store on pallets, separated by production batches.

5. Pipes and installations (copper, PVC)

Problem:

  • Theft (copper is especially vulnerable)
  • Damage during installation (bending, cracking)
  • Incorrect cutting (sections too short)

How to prevent it:✔ Secure the site - use monitoring and locked containers.✔ Use precision cutting tools (e.g., pipe cutters).✔ Record material usage - every pipe segment should be assigned to a specific task (mobile app feature).

6. Paints, adhesives, and sealants

Problem:

  • Drying out of opened containers
  • Incorrect dosing (excess use)
  • Expiration (unused leftovers)

How to prevent it:✔ Buy smaller packages - matched to project stages.✔ Store in shaded areas (avoid drying).✔ Track expiration dates.

How Contractors.es helps reduce material losses

✔ Usage monitoring – know exactly how much and where materials are used.✔ Integration with schedules – materials are available when needed, without surplus.✔ Loss reports – identify the most wasteful areas.✔ Delivery control – compare invoices with actual usage.

Less waste = more profit

Material losses are not only purchase costs - they also cause:

  • Delays (waiting for missing supplies)
  • Penalties (for missed deadlines)
  • Reduced margins (unexpected expenses)

The solution?

Systematic control - from ordering to storage to usage.Contractors.es provides tools to automate this process and save thousands annually.

Want to reduce losses in your company?

Schedule a free demo - we’ll show how to track materials with Contractors.es. Try the demo version - see how easy inventory management can be.

Related articles

How to Manage a Construction Project? 10 Ways to Improve Organization in a Construction Company

How to Manage a Construction Project? 10 Ways to Improve Organization in a Construction Company

Good organization on a construction site does not start with another Excel spreadsheet. It starts with making sure that the right information reaches the right person at the right time. Managing one construction project is relatively easy to control. With several projects running simultaneously, the number of employees, materials, equipment, documents, and decisions that need [...]

2 min read
Construction Company Software - How to Choose the Right System?
TipsERP and CRM

Construction Company Software - How to Choose the Right System?

Information in a construction company comes from many different places - the office, construction sites, the warehouse, and customer communication. Projects, employees, materials, equipment, documents, and costs all need to be connected. At first, Excel, email, phone calls, and messaging apps may be enough. As the company grows, however, it becomes increasingly difficult to find [...]